Install-A-Thon Fall 2004: Difference between revisions
Jump to navigation
Jump to search
Physcofish (talk | contribs) No edit summary |
No edit summary |
||
Line 1: | Line 1: | ||
The first Install-A- |
The first Install-A-Thon held by the MTU LUG on October 30th. Power outages were experienced as a breaker was blown. |
||
Installs occured on over two dozen machines. |
|||
[http://lug.mtu.edu/gallery/install04 Pictures] |
Revision as of 16:37, 23 April 2005
The first Install-A-Thon held by the MTU LUG on October 30th. Power outages were experienced as a breaker was blown.
Installs occured on over two dozen machines.