Install-A-Thon Fall 2004: Difference between revisions
Jump to navigation
Jump to search
Physcofish (talk | contribs) No edit summary |
(No difference)
|
Revision as of 23:23, 21 April 2005
The first Install-A-Thone held by the MTU LUG. Power outages were experienced as a breaker was blown.