Install-A-Thon Fall 2004: Difference between revisions

From MTU LUG Wiki
Jump to navigation Jump to search
No edit summary
 
No edit summary
 
(One intermediate revision by the same user not shown)
Line 1: Line 1:
The first Install-A-Thone held by the MTU LUG. Power outages were experienced as a breaker was blown.
The first Install-A-Thon held by the MTU LUG on October 30th. Power outages were experienced as a breaker was blown.

Installs occured on over two dozen machines.

[http://lug.mtu.edu/gallery/install04 Pictures]

[http://lug.mtu.edu/slides04/ Slides] from presentations.

[http://lug.mtu.edu/installathon.html Information Page]

Latest revision as of 16:39, 23 April 2005

The first Install-A-Thon held by the MTU LUG on October 30th. Power outages were experienced as a breaker was blown.

Installs occured on over two dozen machines.

Pictures

Slides from presentations.

Information Page