Install-A-Thon Fall 2004

Revision as of 21:39, 23 April 2005 by Spi (talk | contribs)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)

The first Install-A-Thon held by the MTU LUG on October 30th. Power outages were experienced as a breaker was blown.

Installs occured on over two dozen machines.

Pictures

Slides from presentations.

Information Page