More actions
(Notes were not taken at the time, this is from recollection after the fact as of 2024-07-13)
- Went over to the GLRC to upgrade the CPUs in the new servers from Tim Van Wagner
- Now Shell, 3 of the 5 K8s servers (the R630's), and Storage are all equipped with dual Intel Xeon E5-2680 v4's.
- The PSUs in Storage are mismatched (700w + 1100w), we'll need to upgrade/downgrade one of them eventually.
- Hoping to get Shell set up soon for new members