Minutes 2009-02-12
Jump to navigation
Jump to search
MTU LUG Meeting Minutes February 12th, 2009 Server Status Lego is missing Has not changed since last time Still needing to manually update some of our mirrors Kuk needs hardware $29.90 IDE cables $11.30 shipping $104.97 3G DDR 400 Total 410.45 Cables - yes Memory - Hold off for now. We're not sure how much it takes Installathon March 21 Rooms weren't available so now a new dates Presentations Installing linux on game system Wii Playstation 3 Introduction to Ubuntu - Steve Video games in Wine - Dark-Fx Photoshop in Wine - Lenor Open Source Gaming - Christian Bash and Fortran - Pastore Website Lenor - Update the CSS for the web page Is the wiki useful? Who has admin? Links back to the home page ` Christian: complete layout redesign Voted Lenor as website admin LFS/Junkyard wars rules Still at same time 2 weeks in our meeting room Facebook event? Teams? number of members effects judging Rules what ever is impressive to the judges? Points difficult hardware network X clustering application Number of machines Time spent working on build Allow them to have working computers on sight? Netboot? if they build the server... Steve is providing a desktop for people to download stuff they can look stuff up on their own computer, but not connect it to their build (can't use it to download packages) Judge has discression over music in the room First one done? total time taken? Status at the end of the day Judges Steve Christian Reward? Thumb drives Floppy drives CD Drives Talk to Next Century Pastore will talk to Next Century and Computer Mechanix END